
Qualified for OEM programs
We make each part to the customer's drawing and to the quality system of the vehicle maker or Tier-1 seat maker we supply.
Certificates
Certified quality management
Our quality management system is certified to the automotive industry standard.
IATF
16949:2016
Manufacture of interior trims and seat coverings
Certified by TÜV SÜD Management Service GmbH
View certificate IATF 16949:2016ISO
9001:2015
Quality management system
View certificate ISO 9001:2015
Approvals
Approvals register
Supplier-quality approvals and certificates, with the route each one came through.
SQ Mark Approved
Certified
Supplier quality (SQ) audit
IATF 16949:2016
Certified
Automotive quality management system · through TÜV SÜD
ISO 9001:2015
Certified
Quality management system

Laboratory
Tested in our own laboratory
We test fabric, foam, PVC and laminates in-house for strength, colour, weight, thickness, flammability and humidity. Instruments for dimensions, light, temperature and speed are on site too.
- Strength and flammability
- Universal testing machine
- Flammability chamber
- Colour and light
- Colour cabinet
- Spectrometer
- Lux meter
- Weight and thickness
- GSM cutter
- Weighing machine
- Thickness gauge
- Dimensions
- Vernier scale
- Measuring tapes
- Measuring scale
- Humidity, temperature and speed
- Humidity chamber
- Thermal scanner
- Tachometer
Quality methods
The frameworks behind every cover
Recognised automotive quality methods, applied to fabric, lamination, cutting and sewing: plan the system, prevent failures, watch the line, remove the causes and keep improving.
QMS
Across every programQuality management system
Documented procedures, internal audits and management review govern each program, from the customer's drawing and requirements to the cover delivered at the seat line.
FMEA
Before a program startsFailure mode and effects analysis
Each step from lamination to sewing is examined for what could go wrong, such as a wrong panel, a weak seam or a lamination defect, and the control that prevents it is set before production.
7 QC tools
Every shiftSeven basic quality tools
Check sheets, Pareto charts, cause-and-effect diagrams, histograms, scatter diagrams, control charts and stratification turn inspection data into decisions on the line.
SPC
During productionStatistical process control
Process measurements are tracked over time against control limits, so drift is seen and corrected before it becomes a defect.
Six Sigma
When a problem repeatsDefine, measure, analyse, improve, control
Recurring defects are worked through DMAIC to find the root cause, fix it in the process and hold the improvement, so the same fault does not reach the customer again.
8D analysis
When a concern is raisedEight disciplines of problem solving
A team contains the problem, traces its root cause, puts a permanent corrective action in place and confirms that it works, then updates the process so the fault stays closed.
Kaizen
OngoingContinuous improvement
Small, practical changes to methods and workstations are proposed, tried and checked, and those that work become the new standard.
Process control
Checked at every stage
- 1
Roll inspection
Fabric and PVC rolls are checked on roll-inspection machines before lamination and cutting.
- 2
Inspection by program
Sewing and inspection sections are set up per customer program, so covers are checked against that customer's standard.
- 3
Daily review
Production, quality, maintenance and training results are posted on review boards and discussed every day.
- 4
Health and safety (OHSAS 18001)
Emergency team, marked exits, fire extinguishers and alarms, a public-address system and regular health and safety training.
Contact
Send us your quality requirements
Jun Automotive India supplies seat trim covers and interior trim to vehicle makers and Tier-1 seat makers, with fabric and lamination from our own group.